Alfa Star Glass is an architectural glass processing factory in Riyadh, Saudi Arabia. We take flat glass and prepare it to project drawings through cutting, edge work, tempering, lamination, insulated unit assembly and surface treatments. Our scope is glass processing and supply.
What happens on site
Processing is a sequence, and the order is not optional. Glass cannot be cut after tempering, and holes cannot be drilled into a tempered sheet — every dimension has to be final before heat treatment.
| Stage | What happens | Why the order matters |
|---|---|---|
| Cutting and edging | Final size, holes, notches and edge finish | Nothing can be changed after this point |
| Tempering | Heat treatment in a horizontal line | Turns the sheet into safety glass |
| Lamination | An interlayer bonds two sheets | Fragments stay held on breakage |
| Insulated units | Sealed cavity with spacer and argon fill | Assembled from already-finished panes |
| Sandblasting | Stencil-applied surface treatment | Applied before heat treatment |
Standards the factory works to
Three certifications are held, and each one covers a different question:
| Certificate | Issued by | What it covers |
|---|---|---|
| EN 12150 | TÜV | Tempered safety glass — fragmentation and strength |
| ISO 9001 | TÜV | Quality management across the process |
| SASO | SASO | Conformity for the Saudi market |
Each certificate is listed on the quality and certifications page.
EN 12150 is the one to look for on a tempered glass order. It defines how the glass has to break — into small blunt fragments rather than shards — and that behaviour is the reason tempered glass is accepted as safety glazing in the first place.
Glass the factory processes
Thickness depends on the product and the application:
| Family | Thickness range |
|---|---|
| Clear float glass | 4 – 19 mm |
| Low-iron ultra-clear | 6 – 19 mm |
| Laminated glass | 6.38 – 21.52 mm |
| Tinted glass | 4 – 12 mm |
| Shower enclosures | 8 / 10 mm |
The full range is on the products page, and the reasoning behind thickness choice is in the glass thickness guide.
What this means for a project
Having the stages in one building changes two practical things.
The first is sequence control. When cutting, tempering and unit assembly sit with different suppliers, a dimension error found at assembly means going back to the start with a different company. Here it stays inside one work order.
The second is batch consistency. Colour and coating vary slightly between glass batches, and that variation is visible when panels sit side by side in a façade or across hotel rooms. Processing a project from the same batch is only possible when the whole project is handled in one place.
Glass supply for projects in Saudi Arabia
From our factory in Badr, Riyadh, we work with architects, contractors, facade specialists and interior project teams. The glass specification depends on its application: safety glazing, insulated units, shower enclosures, balustrades, mirrors or decorative glass.
Include the project city, delivery location and requested date with your enquiry. Supply scope and delivery arrangements are reviewed with the quotation for each order.
What to send for a factory quotation
- Drawings or a panel schedule with final dimensions in millimetres and quantities.
- Glass type, thickness or build-up, and the intended application.
- Edge finish, holes, notches and cut-outs shown on the drawing.
- Required coating, interlayer or spacer details, where specified.
- Project delivery location and requested delivery date for review.
Send these details through request a quote. The processed glass ordering checklist explains how to prepare the specification before production.
Where the factory is
9134 Al Imam Malik Rd, Badr District 3255, Riyadh 14727, Saudi Arabia.
Directions and working hours are on the contact page. To send drawings and get a quotation, use the request a quote page — the ordering checklist lists what to include so the first reply is a real answer rather than a request for more information.
Project references
See glass processed by Alfa Star for the projects below.
All projectsTempered glass cannot be cut, drilled or sandblasted.