Checklist before ordering processed glass

September 5, 2026 · 5 min read

The most expensive delays happen before fabrication starts. This checklist covers what must be fixed before an order is placed.

Checklist before ordering processed glass

AI-generated illustration, not a photograph of a completed project.

The most expensive mistake in a processed glass order is sending dimensions that are not final. Tempered glass cannot be cut or drilled after tempering, so a later change means remaking the panel, not adjusting it. This checklist is what we ask for before production starts.

Before measuring

  • Floor and tiling work finished, because finished floor level changes the height.
  • Hinge, handle and fixing point positions decided.
  • Fixing type known: framed, point-fixed, or base-fixed.

What must arrive with the order

ItemWhy
Final dimensions in millimetresCannot be adjusted after tempering
Thickness and process typeTempered, laminated or insulated
Hole and cut-out positionsMade before the furnace
Edge typeGround, polished or bevelled
Coating orientationThe wrong way round inverts thermal performance
Quantity and install sequenceSets the production and delivery order

Questions that surface problems early

  • Does the position require safety glass? If it is a door, a barrier or overhead, the answer is yes.
  • Do nominally identical openings actually differ? In existing buildings they always do.
  • Who carries the structural calculation for the balustrade or facade?
  • Is there an access route for large panels inside the building? A large panel needs a planned route.

After the order

We confirm dimensions in writing before cutting. The step looks like a formality, but it prevents the most common loss in this trade: a fully fabricated panel that cannot be installed.

What we produce

Cutting, edging, sandblasting and drilling, then tempering, lamination or insulated assembly, to project dimensions under one roof in Riyadh.