Checklist before ordering processed glass
September 5, 2026 · 5 min read
The most expensive delays happen before fabrication starts. This checklist covers what must be fixed before an order is placed.

AI-generated illustration, not a photograph of a completed project.
The most expensive mistake in a processed glass order is sending dimensions that are not final. Tempered glass cannot be cut or drilled after tempering, so a later change means remaking the panel, not adjusting it. This checklist is what we ask for before production starts.
Before measuring
- Floor and tiling work finished, because finished floor level changes the height.
- Hinge, handle and fixing point positions decided.
- Fixing type known: framed, point-fixed, or base-fixed.
What must arrive with the order
| Item | Why |
|---|---|
| Final dimensions in millimetres | Cannot be adjusted after tempering |
| Thickness and process type | Tempered, laminated or insulated |
| Hole and cut-out positions | Made before the furnace |
| Edge type | Ground, polished or bevelled |
| Coating orientation | The wrong way round inverts thermal performance |
| Quantity and install sequence | Sets the production and delivery order |
Questions that surface problems early
- Does the position require safety glass? If it is a door, a barrier or overhead, the answer is yes.
- Do nominally identical openings actually differ? In existing buildings they always do.
- Who carries the structural calculation for the balustrade or facade?
- Is there an access route for large panels inside the building? A large panel needs a planned route.
After the order
We confirm dimensions in writing before cutting. The step looks like a formality, but it prevents the most common loss in this trade: a fully fabricated panel that cannot be installed.
What we produce
Cutting, edging, sandblasting and drilling, then tempering, lamination or insulated assembly, to project dimensions under one roof in Riyadh.